Design-Build

Using parallel work paths to shorten timelines and bring down costs.

Design Build Header

Design-Build project delivery allows owners to contract with one company which provides both design and construction services. Efficiency and innovation drive cost savings when the Design-Build team is focused on project performance and schedule requirements.

Streamlined processes, built-in efficiencies

Design packages are produced to support the overall project schedule, instead of the traditional design delivery schedule. Using collaborative project management of design production and constructability review, problems are solved faster. Shorter design schedules lead to improved project schedules. Time-sensitive materials can be ordered earlier because design and procurement schedules are aligned, which reduces the overall project duration.

Contract risk for the owner is reduced because the responsibility for quality, cost and schedule are placed with the Design-Builder. Owners can spend more time on their project and with their Design-Builder.